

Discover our extensive range of Cummins, Perkins, Weichai, and SDEC diesel generator sets, available in power outputs ranging from 10kVA to 1200kVA. These 3-Phase Portable Backup Power units are meticulously designed for silent operation, ensuring seamless performance without disruptions. Each generator is equipped with a superior Stamford or Leroy Somer alternator, alongside advanced ATS, ISO, and CE certifications, to guarantee reliability and efficiency under any conditions.
Other brands of generator sets
Technical Parameter |
Brand |
Cummins/Weichai/Yuchai/SDEC/, etc |
Power |
50kva/100kva/300kva/500kva/800kva/1000kva, etc |
Customizable |
Open type/Silent type/Containerized type/Mobile trailer type |
Voltage |
110V/220V/230V/240V/400V/480V/380V |
Rated frequency |
50HZ/60HZ |
Rated speed |
1500/1800 |
Steady-state voltage regulation rate |
≤±1% |
Transient voltage regulation rate |
+20%~-15% |
Steady-state frequency adjustment rate |
≤±1% |
Transient frequency adjustment rate |
+10%~-7% |
Waveform distortion rate |
≤5% |
Voltage fluctuation rate |
≤±0.5% |
Voltage stabilization time |
≤1S |
Frequency fluctuation rate |
≤±0.5% |
Frequency stabilization time |
≤3S |



Jiangsu Xinghuachang Power Generation Equipment Co., Ltd., a powerhouse in diesel generator manufacturing, proudly integrates scientific research, development, and sales. With over 20 years of dedication, we focus on delivering innovative power generation solutions tailored to user needs. Specializing in crafting both domestic and imported diesel generators within the 10KW to 3000KW range, we adhere strictly to the GB/T2820-1997 production standards, ensuring excellence in every product.

Q: Do you offer OEM service?
A: Yes
Q: What is your payment term?
A: 30% T/T in advance, the rest payment before shipment. Or irrevocable L/C.
Q: What is your MOQ?
A: 1pc
Q. Which port do you often use when export?
A: Shanghai Port, or as customer request.
Q: What is the difference between Prime power and Standby power?
A: Prime power is 12hours continous power,one hour 10% over load in every 12 running hours is allowed.
Standby power is the limit value of maximum output for emergency use. Overloading is prohibited.
Q:What's your delivery time?
A: Our normal delivery time is 25 working days. But if your order is some special engine and alternator, then the delivery time is longer.